
Two Phase 220V 10% 2000mm Paper Pulp Making Machine
Contact Person : haiyang
Phone Number : 0086 18339195474
WhatsApp : +008618339195474
Minimum Order Quantity : | 1 | Price : | USD 10000-50000 |
---|---|---|---|
Packaging Details : | 1. Seaworthy export packing 2. Standard export packing 3. As per customers' requirement | Delivery Time : | 30 days before delivery |
Payment Terms : | T/T, L/C |
Place of Origin: | China | Brand Name: | Haiyang |
---|---|---|---|
Certification: | CE |
Detail Information |
|||
Name: | Hydraupulper | Material: | Stainless Steel |
---|---|---|---|
Usage: | Broken Waste Paper | Color: | Customized |
High Light: | 5% Paper Pulp Making Machine,75kw 60T/D Paper Pulp Making Machine,60T/D d type pulper |
Product Description
Stainless Steel Paper Machine Hydrapulper D Type Hydrapulper
Description
1. New energy saving rotor to improve the hydraulic circulation and pulping efficiency, less power consumption.
2. D-type vat structure to change the stock flow, quick and frequent contacts between rotor and pulp, short pulping time, more capacity.
3. Adjustable clearance between rotor and pulper plate, raised pulper, heavy impurities drop to reject vat and trash well easily to avoid the wear of rotor and pulper plate.
Parameters
Model | HY-23 | HY-24 | HY-25 | HY-26 | HY-27 | HY-28 | HY-29 | HY-30 | HY-31 | HY-32 | HY-33 | HY-34 | HY-35 | HY-36 |
Nominal Volume (M3) | 5 | 10 | 15 | 20 | 25 | 30 | 35 | 40 | 50 | 60 | 70 | 90 | 120 | 140 |
Consistency (%) | 3-5% | 3-5% | 3-5% | 3-5% | 3-5% | 3-5% | 3-5% | 3-5% | 3-5% | 3-5% | 3-5% | 3-5% | 3-5% | 3-5% |
Capacity (T/D) | 20-60 | 60- 100 |
90- 120 |
140- 180 |
180-230 | 230-280 | 260- 330 |
300-380 | 370-450 | 460- 550 |
550- 650 |
650- 800 |
800- 1000 |
1000-1200 |
Motor power (Kw) | 75 | 110 | 160 | 185 | 220 | 280 | 315 | 355 | 450 | 560 | 630 | 900 | 1100 | 1250 |
About us
Since 1989 Qinyang City Haiyang Papermaking Machinery Co., Ltd has been established who is specialist in manufacturing a wide range of Paper Machines for Kraft, Test liner, Fluting paper, Corrugate, Writing & Printing, Newspaper, Duplex Board. We have more than 30 years expertise lies in applying state of the art technology to provide cost effective custom designed solutions to suit their varied requirements.
This company has processing and testing equipment like Longmen CNC machine, planer milling machine, vertical boring machine, automatic continuous welding machine, high speed dynamic balance correction machine, assembly test table etc. With sophisticated processing machinery and professional technical personnel, this company can produce super paper machine equipment.
Our Service
Pre-Sales Service
1. Offering comprehensive technical and business consultation services;
2. Proposing the most suitable scheme and equipment for our clients;
3. Designing and fabricating targeted products according to the special requirements of clients;
4. Training periodically high qualified service technician.
After-Sales Service
1. Highly inspecting equipment in every working procedure, quality comes first;
2. Fast & Safe Delivery;
3. Assisting our clients for foundation construction of equipment;
4. Dispatching engineers to install and debug equipment;
5. Training the first-line operators on site;
6. Regularly visit clients to solve production problems;
7. Providing technical exchanging.
What document you provide?
1) Full set of machine;
2) Detail of operation and maintain in English;
3) Commercial invoice, packing list, bill of lading etc, according to custom requirement.
How can i get quotation from you?
Output paper type; Capacity(tons per 23hours); Output paper weight(gram per m2); Raw material.
How long is guarantee period for paper making machine?
12 months after formal operational.
How about delivery time?
Usually, the delivery time for smaller machines is 30-45 days after receiving deposit, but for bigger machines, it will be longer to make sure the equipment quality.
What is your payment terms?
T/T(telegraphic transfer) 30% as deposit, and 70% balance paid before shipment.
1) 30% T/T within 10days after sign contract;
2) 70% T/T before shipment;
3) 100% L/C is also acceptable.
Enter Your Message