3% Paper Pulp Making Machine
Product Details:
Place of Origin: | China |
Brand Name: | Haiyang |
Certification: | CE |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 |
---|---|
Price: | USD 10000-50000 |
Packaging Details: | Container, wooden box or according to international packaging standard |
Delivery Time: | 30 days before delivery |
Payment Terms: | T/T, L/C |
Detail Information |
|||
Name: | Hydrapulper | Type: | Pulping Equipment |
---|---|---|---|
Material: | Carbon Steel Or Stainless Steel | Application: | Paper Pulping |
Place Of Origin: | Henan, China | Automatic Grade: | Automatic |
Packaging Material: | Paper | ||
High Light: | 3% Paper Pulp Making Machine,50t/d Paper Pulp Making Machine,50t/d hydro pulper machine |
Product Description
Hydrapulper Paper Pulp Making Machine Broken Waste Paper
Hydrapulper application
New Type D Type Hydrapulper Paper Production Equipment for Paper Mill, which improves the work efficiency, and it can be used for pulping waste paper & wet strengh paper. D Type Hydrapulper is mainly used to crushing pulp board, wastepaper, deinking, and pulp purification. Through dissociating, it can maximum make the paper’s fiber dissociating into fiber bundles or single fibers, while at the same time, it can maximize maintain impurity’s shape and strength.
Hydrapulper specification
Type | HY23 | HY24 | HY25 | HY26 | HY27 | HY28 | HY29 | HY30 | |
normal volume(m3) | 5 | 10 | 15 | 20 | 25 | 30 | 35 | 40 | |
consistency(%) | 3-5 | ||||||||
production capacity(t/d) | 30-60 | 40-100 | 80-120 | 140-180 | 180-230 | 230-280 | 270-320 | 300-370 | |
motor power(kw) | 75 | 110 | 160 | 185 | 220 | 280 | 315 | 355 |
Hydrapulper Advantage
FAQ
Q: What can I get suitable scheme basis on my requirement ?
A : Please tell me what raw material you want use and how many capacity you want produce per day when you sent email to me .We will be provide better offer for you .
Q: Will you send engineers to design our plant and install the equipment?
A: Yes, Our factory will arrange engineer to supply the professional drawing and install and train the workers about adjusting the equipemnt ,disposing of the trouble maybe happen and maintenance of the machine , after training ,the workers will get work license we distribute .
Q:Payment erms
A: (1) 30% T/T within 10days after sign contract
(2) 70% T/T before shipment
(3) 100% L/C is also acceptable
Q:How to operate and maintain the machine?
A: We will provide a professional and detailed USER GUIDE to you with the machine;
Q: What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.